Background:
As one in a series of important supporting construction projects, the Pingtan Comprehensive Experimental Zone’s International Digital Economic Port – Second Bridge Second Line Channel Project, is the channel guarantee for smooth operation of the Pingtan Strait Bridge based on effective information and data processing, which was enabled by Vertiv integrated micro-modular, power, and cooling solutions.
Results:
- Rapid infrastructure deployment
- Enhanced equipment protection
- Ensured system availability
- Continuity of bridge operations
Case Summary | |
---|---|
Location: |
China |
Critical Need: | To protect critical business systems and support optimal bridge operations, the construction teams for the Pingtan Strait Bridge sought intelligent and proven digital infrastructure solutions that could be deployed quickly and supported locally for maximum availability in a complex marine environment. |
Vertiv Solution: |
|